Stücki Park

Laboratory and office building built in core&shell in the 'Life Sciences' area in the west of Basel.

Besides the ’Stücki’ and ’Deutsche Bahn’ properties, this 23’000 square meter lot is one of the few remaining contiguous properties in the city of Basel. Based on a competition won by Blaser Architects, a flexible new laboratory and office park for life science and biotechnology research was planned.

The design calls for using the elevated street as an entry and communications level. Below this floor are delivery, parking, and storage facilities. Above are six laboratory and office levels. Because of the innovative facade design with a newly developed hightech membrane system, the building will be truly eye-catching. Blaser Architects are responsible for all design and planning activities. The construction start was 2006.

Projektinformationen

Location

Basel

Comission

Generalplaner

Client

Swiss Prime Site Immobilien AG

Status

Completed

Duration

01.2002 – 03.2012

3712 days

Volume m3

190'000

gros floor area m2

47'650

net floor area m2

33'730

Photography

Lilli Kehl, Archiv BA AG

7
28,57 %
71,43 %
37120