Ferrari-Maserati-Parking

Installation of a Ferrari-Maserati garage in existing sheds.

Four adjoining warehouse halls with a total area of 1’834 square meters, built between 1939-56, were renovated as display area, repair shop, office area, and sales area.

The corporate identity guidelines of Ferrari-Maserati needed to be followed. The industrial design of the halls and superlative design of the cars blend together to form an exciting environment for sales, service, and repair.

Projektinformationen

Location

Basel

Comission

Architect

Client

Zanotelli AG / Niki Hasler AG

Status

Completed

Duration

01.2003 – 11.2003

304 days

Volume m3

25'195

gros floor area m2

3'027

net floor area m2

2'764

Photography

Andreas Sütterlin

2
0 %
100 %
608

Projektbild
Projektbild
Projektbild
Projektbild

Projektbild
Projektbild
Projektbild